Sign up to receive a text message or email when new bids are added!
Bid Title: Division Well Field Solar Project
Category: DWP Bid Postings
Status: Closed

Description:
City of Big Bear Lake Department of Water and Power (BBLDWP) is accepting sealed proposals for a design-build contract to design and construct a turnkey photovoltaic solar electric generating system which will be sized to be approximate a 275 kW system to provide power to four of the Division Well Field Pumping Plants. The project will include site preparation, ground mounted solar panels, inverters, net meters for the four pumping plants, conductors, conduits, and site fencing. 

Proposals will be received at: BBLDWP, Attn: Steve Wilson, Water Superintendent, 41972 Garstin Drive, Big Bear Lake, CA 92315. 

Complete digital project documents are available at www.questcdn.com and bbldwp.com




Publication Date/Time:
10/26/2018 11:45 AM
Closing Date/Time:
11/20/2018 10:00 AM
Submittal Information:
Proposals for this contract will be accepted until 10:00 AM on Tuesday, November 20, 2018.
Pre-bid Meeting:
11/02/2018 10:00 AM
Contact Person:
Project Engineer, Water Systems Consulting Inc., Christopher Deiter at (909)483-3200 x203, cdeiter@wsc-inc.com.
Plan & Spec Available:
In order to appear on the Planholders List, a prospective bidder MUST download the bid documents from questcdn.com.
Special Requirements:
IMPORTANT NOTICE: In order to appear on the Planholders List, a prospective bidder MUST download the bid documents from questcdn.com. Prospective bidders who do not appear on the Planholders List will NOT be notified of addenda. A MANDATORY Pre-Proposal Meeting and Site Tour will be held at 10:00 AM on Friday, November 2, 2018 at the BBLDWP office. For questions, contact Project Engineer, Water Systems Consulting Inc., Christopher Deiter at (909)483-3200 x203, cdeiter@wsc-inc.com.
Related Documents:

Return To Main Bid Postings Page